Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Drumkee

project details
Contestable, Client-side & BoP works

Civil & Electrical Balance of Plant Works

  • Carry out Principal Designer and Principal Contractor duties as defined under CDM Regulations 
  • Design Works included Site Layout Plan; SLD; HV & LV Cable Layout; Earthing Studies; P28/P29/G5-4 System Studies; Battery Container Foundations and all As-Built Documentation 
  • Full time Site Manager and HSEQ Management 
  • Site Security – 24/7 remotely monitored CCTV and Welfare Units 
  • Supply & Install Below and Above Ground Earthing 
  • Supply & Install access track from highway boundary on to site 
  • Drainage as required through site to a single discharge point 
  • 2.4m high fencing around site, plus all Landscaping to comply with planning conditions 
  • Supply & Install Concrete Block Foundations, and associated Piling for Battery Storage Containers, Transformers and MV Power Stations 
  • Supply & Install Crushed Stone, dark grey, porous surface within the proposed access track 
  • Supply and Install underground ducting for all 33kV Cabling and Supply & Install Above Ground Cable Ladder Rack / Tray Work Systems for MV & DC Cables as required 
  • Supply and Installation of 33kV Substation Equipment including Switchboards, Battery, and Charger, LVAC Board and Ground Mounted Auxiliary Transformer 
  • Supply & Install 33kV Al Cable, and Multicore Cable including Cable Jointing and Terminations

Contestable Works DNO Compound

  • Civil Design included Site Layout; DNO Control Room; Earth Switch & CVT Foundation Design; Compound Drainage Design; Cable Trough Design; and associated As-Built Documentation 
  • Civil Project Management, including HSEQ Management 
  • Supply & Install 65m of External Palisade Fencing and 1 External Palisade Gate to NIE specification 
  • Supply & Install 110kV Disconnector Foundations; 110kV CVT Foundations; 110kV Post CT Foundations and Lighting Column Foundations 
  • Supply & Install Cable Trough within the Compound 
  • Supply & Install Below Ground Earthing within the NIE Compound 
  • Supply & Install 1x NIE Block-Built Control Room 
  • Supply & Install Internal Compound Stone and Drainage 

Contestable Works Client-side Compound

  • Compound Earthing Layout 
  • Civil Design included Single Line Diagram; Protection Drawings; Substation Compound Layout; Transformer Design Works; Switchroom Foundation; Busbar Connection Details and all associated As-Built Documentation 
  • Supply & Install 110kV Dead Tank Circuit Breaker Foundation, 110kV Disconnector Foundation, 110/33kV Transformer Bund including NER Foundations & Auxiliary Earthing Transformer Bund Foundation 
  • Supply & Install Customer Cable Troughs & Ducts 
  • Supply & Install 80m of External Palisade Fencing and 1 x External Palisade Gate 
  • Supply & Install gravel Unbound Access Road within the Compound 
  • Supply & Install Below Ground Earthing within the Customer Compound 
  • Supply & Install a GRP Containerised Switchroom for the 33kV Switchboard and all Control Equipment 
  • Supply & Install HV Equipment including 110kV Dead Tank Circuit Breaker; 110kV Manually Operated Line Disconnectors plus Integrated Earth Switch; 60MVA 110/33V Transformers; Auxiliary Earthing Transformer; Transformer Bund Pump; NER; 110kV Busbars and Clamps; Panel, 1250A, 33V Transformer Circuit Breaker 
  • Supply & Install 1 x 110kV Steel Support Structures as required for the Line Disconnectors and Earth Switch 
  • Supply & Install all 33kV and LV Cabling within the Compound 
  • Supply & Install Transformer HV & LV Protection Panels; Transformer Automatic Tap Change (AVC) Control Panel 
  • Supply & Install Above Ground Earthing to Support Structures and Equipment within the Customer Compound 
  • Supply & Install 2 x External Lighting Columns and Foundations plus Light Fittings including Low Voltage Cables within the Compound 

Project Statistics

Project: Drumkee Battery Storage
Completed: December 2020
Output: 110kV
Location: County Tyrone
DNO: