With the significant growth in the BESS sector, G2 Energy have established themselves as the sector leading ICP & BoP contractor. In 2017, G2 Energy connected the very first UK large scale BESS projects at Glassenbury (40MW) and Cleater (10MW), under the first National Grid EFR contracts.
Since those first projects, G2 have now completed over 20 fully operational BESS developments, with circa 700MWhr of BESS capacity connected to the grid – this represents around 35% of the UK’s operational BESS sites.
G2 are also currently contracted on a further 21 development sites with a further 2GWhr of battery storage to be connected to the grid by the end of Oct 2023 (as at Sept 2022).